Tetrapod laying in Pesaro’s offshore port
In detail
The works were carried out using motor vessel FERNANDO and comprise the loading on board of concrete tetrapods (weighing 180/250 quintals) stacked on the quay, and their relocation.
Their subsequent unloading, and direct placing as planned, was handled using our LIEBHERR 895 digger.
Portfolio
- Mose system realization

- Digging, filling in and assistance in laying a 1400mm pipeline

- Reef system for the protection of Lido di Savio

- Maintenance intervention on the delta’s sea outlets of Po di Levante

- Dredging of the seabed of Porto Garibaldi

- Dredging intervention on the Southern industrial canal

- Ecological and selective dredging, seabed cleaning of La Spezia’s port

- Tetrapod laying in Pesaro’s offshore port






